Checklists
The following checklists summarize the documentation that must be submitted at the time of an application. Applications will not be accepted when any of the required information has not been submitted.
- Addition to an Existing Dwelling Applicable Law
- Deck - Attached or Detached
- Detached Garage Full Foundation and Footings
- Detached Garage Slab on Grade
- Document/Drawing Submission - Alterations
- Document/Drawing Submission- New Buildings
- Document/Drawing Submission - Housing
- Interior Alterations Permit Application
- Secondary Unit
- Shed
- Siding
- Single Family Dwelling or Semi-Detached
- Swimming Pool - Above Ground or In-Ground
- Weeping Tiles or Sump Pit and Pump