2020
2020 Bridge Capital Project Summary
2020 Utilities Meeting
The Annual Utilities Meeting is being held on Wednesday, May 26, 2020. The purpose of this meeting is for the City and the utility companies to coordinate and discuss the requirements for the various utility projects happening during the 2020 construction season .
Utility Companies Proposed Projects
Ash Street
Ash Street (Lively) from Maple Street to the South End
The City of Greater Sudbury will be completing road, water and sanitary improvements on Ash Street (Lively), between Maple Street and the southern limit.
Construction by the City’s contractor, Hollaway Equipment Rental Ltd., will be carried out between
May 15 and September 2020. Work will take place Monday to Friday, 7:00am to 7:00pm.
Final asphalt will be completed on September 25, 2020. Please note these timelines are subject to change.
Construction Details:
- Excavate and install a new watermain on Ash Street with new water services to houses;
- Complete interior plumbing works to connect the water service to the existing plumbing where required;
- Abandon in-place, the existing rear yard watermain and services;
- Realign and replace or abandon sections of the rear yard sanitary sewer main;
- Storm sewer replacement;
- Sidewalk replacement and curb and gutter installation along the east side of Ash Street;
- Repave the road surface;
- Restore all areas affected by construction
During construction, there may be dust and noise in the area. The City makes every effort
to reduce the impact to nearby residents and business owners. Thank you for your
patience as we work to improve the roads and infrastructure in your neighbourhood. The
City of Greater Sudbury and its contractors are committed to public safety and will monitor
the ongoing progress of construction.
Project Manager:
Kerry Loken
705-674-4455 ext. 4309
kerry.loken@greatersudbury.ca
Auger Avenue
The City of Greater Sudbury will be completing road improvements on Auger Avenue between Falconbridge Road and Hawthorne Drive
Construction Details:
- Road Resurfacing
- Addition of new sidewalk on the west side between Falconbridge Road and Hawthorne Drive
- Replacement of concrete curb
- Sidewalk repair (where required)
Expected Start Date: Spring/Summer 2020
Expected End Date: Fall/Winter 2020
*Timeline is subject to change*
Files related to this project include:
Project Manager:
Andrew Peltomaki
705-674-4455, extension (4392)
andrew.peltomaki@greatersudbury.ca
Brady Street
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Brady Street (MR55) from the CPR Underpass to Keziah Court and on Minto Street from Brady Street (MR55) to Larch Street.
Construction by the City’s contractor, Interpaving Ltd., will be carried out between June 2020 and November 2020
Construction Details:
- Removal of top lift of asphalt and placement of new asphalt
- Spot repair of concrete curb and sidewalk
- Installation of pedestrian crossover at Memorial Park
- Upgrades to the traffic signals at Brady Street and Minto Street intersection
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Coniston Creek Pedestrian Bridge
ENG20-50 Coniston Creek Bridge Replacement
The City of Greater Sudbury will be replacing a pedestrian bridge over Coniston Creek, 100 m east of Poplar Street.
Construction Details:
- Removal and replacement of the superstructure,
- Removal and replacement of existing abutments,
- Installation of new metal tube traffic barrier on bridge,
- New asphalt pavement on pathway approaches.
Construction by the City’s contractor, Dominion Construction, will be carried out between June, 2020 and October 2020.
Work will take place Monday to Friday,7:00 am to 7:00 pm. Final asphalt to be completed in the 2020 construction season.
*Timeline is subject to change*
Related Documents
Pre-Construction Notice
Construction Notice
Public Information Session
Resident Notice
Plan
Section
On March 24, 2020, the Province of Ontario classified the construction industry as essential. Work on the approved 2020 capital budget is ongoing and the City is committed to the planned infrastructure improvements.
Under normal circumstances, the City would hold public information sessions to explain these projects and their impact on communities. Instead, we are publishing information online and asking residents to review these documents from their homes.
Project Manager:
Jody Rybachuk
705-674-4455, extension 4493
Jody.Rybachuk@greatersudbury.ca
Dean Avenue and Jane Street
The City of Greater Sudbury will be completing road and water/wastewater improvements on Dean Street and Jane Street, Sudbury, between Lorne Street and Landsend.
Construction by the City’s contractor,
Garson Pipe Contractors, will be carried out between May 4, 2020 and the fall of 2020. Work will take place Monday to Friday, 7:00am to 7:00pm.
Final asphalt will be completed in the fall of 2020.
Please note these timelines are subject to change. Construction Details:
- Road reconstruction
- New sidewalk and asphalt boulevard
- Watermain replacement
- Sewer spot repairs
Project Manager:
Marc Khoury
705-674-4455, extension 2935
marc.khoury@greatersudbury.ca
Desmarais Road
Desmarais Road (Valley East)
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Desmarais Road (Valley East) between Talon Street to Gravel Drive.
Construction by the City’s contractor, Garson Pipe Contractors Ltd., will be carried out between June 2020 and September 2020.
Construction Details:
- In-Place Recycling of Existing Asphalt
- Placement of New Asphalt
- Drainage Improvements including some ditching and road culvert replacements
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Questions about construction can be directed to:
Project Manager:
Miranda Edwards
705-674-4455 ext. 4246
miranda.edwards@greatersudbury.ca
Dominion Drive
Pavement Rehabilitation and Infrastructure improvements on Dominion Drive from Municipal Road 80 to Elmview Drive.
The City of Greater Sudbury would like to thank the area residents for their patience during the ongoing construction over the past year. This Construction Notice Update is to inform residents that work will resume on April 14, 2020.
By the end of July 2020, the following will occur:
- Road and multiuse path restoration at the Box Culvert
- Completion of the multiuse path
- Shouldering and road widening
- Driveway and front yard restoration
- Municipal Road 80 Traffic Signal Improvements
- Adjustment of structures and completion of roadway Asphal
Should any issues arise or if there is anything you wish to discuss, please contact the Project Manager listed below
We appreciate your patience and cooperation with this important project.
Questions about construction can be directed to:
Project Manager:
Kevin Reynish,
705-674-4455, extension 3613
kevin.reynish@greatersudbury.ca
Elm and Beatty Streets
Construction by the City’s contractor, Garson Pipe Contractors, will be completed by Fall 2020.
The following work will occur:
- New Pavement
- Curb and sidewalk replacement
- Sewer spot repairs
- Final Restoration
Please note this timeline is subject to change.
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Should any issues arise or if there is anything you wish to discuss, please contact the Project Manager below.
We appreciate your patience and cooperation with this important project.
Questions about construction can be directed to:
Project Manager:
Marc Khoury
705-674-4455, extension 2935
marc.khoury@greatersudbury.ca
Elm Street
The City of Greater Sudbury will be completing road rehabilitation and watermain
improvements on Elm Street, between Pine Street and Elgin Street.
Construction by the City’s contractor,
Denis Gratton Construction Limited,
will be carried out from mid April 2020 and be completed in late summer 2020.
Work will take place Monday to Friday
7:00am to 6:00pm.
Please note these timelines are subject to change.
Construction Details:
- Watermain Replacement
- Watermain Lining
- Sewer Upgrades
- Road Resurfacing
Project Manager:
Marc Khoury
705-674-4455, extension 2935
marc.khoury@greatersudbury.ca
Fourth Avenue
Fourth Avenue (Sudbury)
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road and water improvements on Fourth Avenue, Sudbury, between Bancroft Drive and Greenwood Drive.
Construction by the City’s contractor, Teranorth Construction and Engineering Ltd., will be carried out between May 11, 2020 and September 2020.
Work will take place Monday to Friday,
7:00am to 6:00pm.
Final asphalt to be completed in the 2020 construction season.
Please note these timelines are subject to change.
Construction Details:
- Supply and Placement of Hot Mix Asphalt
- Drainage Improvements including ditching
- Driveway Restoration
- Various water service replacements (history of freezing)
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Questions about construction can be directed to:
Project Manager
Andrew Peltomaki
705-674-4455 ext. 4392
andrew.peltomaki@greatersudbury.ca
Frood Road
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Frood Road (MR 42) between Elm Street (MR 35) and College Street (MR 63).
Construction by the City’s Contractor, Teranorth Construction & Engineering Limited will be completed in the following phases:
Phase 1 – Will be carried out from October 2020 to November 2020.
Phase 2 – Will be carried out from June 2021 to August 2021.
Construction Details:
Phase 1:
• Placement of base asphalt
Phase 2:
• Placement of surface asphalt
• Spot repair of concrete curb and sidewalk
• Repair of storm structures
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Questions about construction can be directed to:
Project Manager:
Miranda Edwards
705-674-4455, extension 4246
miranda.edwards@greatersudbury.ca
Hawthorne Drive
Hawthorne Drive, Sudbury
Watermain Lining
The City of Greater Sudbury will be completing Watermain Lining on Hawthorne Drive, Sudbury, between Patrick Avenue and Delaware Avenue.
Construction by the City’s contractor, Fer-Pal Construction Limited, will be carried out between
May 2020 and October 2020.
Construction Details:
- Install temporary above-ground water supply system
- Watermain lining
- Restoration to affected areas
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager:
Marc Khoury
705-674-4455, extension 2935
marc.khoury@greatersudbury.ca
Henry Street
Henry Street (Garson)
The City of Greater Sudbury will be completing road and water improvements on Henry Street, Garson, between McDougall Street and Rule Street.
Construction by the City’s contractor, Hollaway Equipment Rental Ltd., will be carried out between June and October 2020.
Work will take place Monday to Friday, 7:00 am to 7:00 pm.
Final asphalt will be completed fall 2020.
Please note timelines are subject to change
Construction Details:
- Excavate and install a new watermain along Henry Street
- Installation of new water services to houses along the north side of Henry Street
- Abandon in place, the existing rear yard watermain and services
- Complete interior plumbing works to connect the water service to the existing plumbing where required. Those homeowners affected will be contacted separately.
- Storm sewer replacement
- Curb and gutter replacement
- Repave the road surface
- Restore all areas affected by construction
Expected Start Date: Spring/Summer 2020
Expected End Date: Fall/Winter 2020
The construction phase of the Project is anticipated to be carried out between June and October 2020.
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager:
Kerry Loken
705-674-4455 ext. 4309
kerry.loken@greatersudbury.ca
Hidden Ridge Court
Hidden Ridge Court (Sudbury)
Surface Asphalt Placement
The City of Greater Sudbury will be completing surface asphalt placement on Hidden Ridge Court, Sudbury, from Moonrock Avenue to the cul-de-sac.
Construction Details:
- Supply and Placement of Hot Mix Asphalt
Expected Start Date: Spring/Summer 2020
Expected End Date: Fall/Winter 2020
Project Manager
Andrew Peltomaki
705-674-4455 ext. 4392
andrew.peltomaki@greatersudbury.ca
High Falls Road
High Falls Road Bridge
The City of Greater Sudbury will be completing road improvements on High Falls Road, 1.2 km north of MR 5 Spanish River Road.
Construction Details:
- Replacing existing bridge with pre-cast concrete girder bridge.
- Constructing temporary detour bridge to maintain traffic.
- Installing new guide rails and energy attenuating end treatment.
- Repaving bridge approaches
Expected Start Date: Summer 2020
Expected End Date: Fall 2020
*Timeline is subject to change*
Related Files:
On March 24, 2020, the Province of Ontario classified the construction industry as essential. Work on the approved 2020 capital budget is ongoing and the City is committed to the planned infrastructure improvements.
Under normal circumstances, the City would hold public information sessions to explain these projects and their impact on communities. Instead, we are publishing information online and asking residents to review these documents from their homes.
Questions about construction can be directed to:
Project Manager:
Chris Cornell
705-674-4455, extension 4239
chris.cornell@greatersudbury.ca
Ironside Lake Road
Bridge Replacement
The City of Greater Sudbury will be completing road and bridge Improvements on Ironside Lake Road, 0.3kM West of MR 84 Moose Mountain Mine Road.
Construction Details:
- Replace existing bridge with a steel modular bridge.
- Improve approach road profile and roadside safety features including steel beam guide rails and energy attenuating end treatments.
- Construct a temporary detour bridge to maintain traffic during construction.
Expected Start Date: Summer 2020
Expected End Date: Fall 2020
Related Documents:
The construction phase of the Project is
anticipated to be carried out between July 2020 and October 2020.
*Timeline is subject to change*
Project Manager:
Chris Cornell
705-674-4455, extension 4239
chris.cornell@greatersudbury.ca
Kelly Lake Road
The City of Greater Sudbury will be completing road and wastewater improvements on
Kelly Lake Road, Sudbury, between Copper Street and Junction Creek Bridge.
Construction Details:
• Road reconstruction
• New sidewalk and cycle facility
• Sewer and wastewater improvements
• Intersection improvements
Expected Start Date: Fall 2020
Expected End Date: Fall 2021
*Timeline is subject to change*
Project Overview and More Information
Project manager:
Miranda Edwards
705-674-4455, extension 4246
Miranda.Edwards@greatersudbury.ca
Larocque Avenue
Larocque Avenue (Val Caron)
Surface Asphalt Placement
The City of Greater Sudbury will be completing surface asphalt placement on Larocque Avenue, Val Caron, from Guimond Avenue to cul-de-sac.
Construction Details:
- Supply and Placement of Hot Mix Asphalt
- Complete concrete sidewalk from 30m north of Guimond Avenue to 130m north of Guimond Avenue (west side)
Expected Start Date: Spring/Summer 2020
Expected End Date: Fall/Winter 2020
Project Manager
Andrew Peltomaki
705-674-4455 ext. 4392
andrew.peltomaki@greatersudbury.ca
Martindale Road
ENG20-52 Bridge Rehabilitation, Martindale Road Bridge #1532
The City of Greater Sudbury will be completing road improvements on Martindale Road between MR55 & Copper St.
Construction Details:
- Single Lane Traffic
- Remove and replace the existing asphalt, sidewalk, curb & gutter, guiderail.
- Concrete repairs
- Waterproofing
Construction by the City’s contractor, Belanger Construction Ltd., will be carried out between June, 2020 and October 2020.
Work will take place Monday to Friday,7:00 am to 7:00 pm.
Final asphalt to be completed in the 2020 construction season.
The construction phase of the Project is anticipated to be carried out between June 2020 and October 2020
*Timeline is subject to change*
Related Documents:
Pre-Construction Notice
Construction Notice
Resident Notice
Public Information Session
Plan
Section
Project Manager:
Jody Rybachuk
705-674-4455, extension 4493
Jody.Rybachuk@greatersudbury.ca
Maxam Landing
oxam Landing (Sudbury)
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Moxam Landing Road, Sudbury, from Gibson Road to 800 m South.
Construction by the City’s contractor, Teranorth Construction and Engineering Ltd., will be carried out between May 11, 2020 and September 2020.
Work will take place Monday to Friday, 7:00am to 6:00pm.
Final asphalt to be completed in the 2020 construction season.
Please note these timelines are subject to change.
Construction Details:
- Full Depth Removal of Existing Asphalt
- Supply and Placement of Hot Mix Asphalt
- Drainage Improvements including ditching
- Rock Removal to accommodate ditching
- Guide Rail Replacements
- Driveway Restoration
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager
Andrew Peltomaki
705-674-4455 ext. 4392
andrew.peltomaki@greatersudbury.ca
Montrose Watermain Booster Station Upgrades
The City of Greater Sudbury will be upgrading the Montrose Booster Station at the corner of Montrose Avenue and Thorncliffe Court.
Construction by the City’s contractor,
Cast Construction Inc., will be carried out between July 2020 and Spring 2021.
Work will take place Monday to Friday, 7am to 7pm.
Final asphalt will be completed 2021.
Please note these timelines are subject to change.
Construction Details:
- Installation of a below ground water booster chamber with pumps
- Installation of an above ground electrical and control panel
- Temporary water by-pass around construction area
- Restoration as required of adjacent properties and road
Project Manager:
Kerry Loken
705-674-4455 extension 4309
kerry.loken@greatersudbury.ca
Moose Mountain Mine Road
Bridge Reconstruction
The City of Greater Sudbury will be completing road and bridge improvements on Moose Mountain Mine Road (MR 84), Capreol area, 1.0km South of Milnet Road."
Construction Details:
- Bailey Bridge Replacement
- Asphalt Paving
- Guiderail Installation
- Temporary Detour Bailey Bridge
Expected Start Date: mid June 2020
Expected End Date: mid October 2020
Related Documents
Pre-Construction Notice
Resident Notice
Public Information Session
Plan
Section
The construction phase of the Project is anticipated to be carried out between June 15, 2020 and October 16, 2020.
*Timeline is subject to change due to COVID-19 Restrictions*
Project Manager:
Chris Cornell
705-674-4455, extension 4239
chris.cornell@greatersudbury.ca
MR 35 - Road Widening and Infrastructure Improvements
The City of Greater Sudbury is widening Municipal Road 35 (MR35) from Notre Dame Street East, Azilda to Highway 144, Chelmsford. The new roadway will include road widening to four lanes from Notre Dame East to Notre Dame West and to five lanes from Notre Dame West to Highway 144 (including a continued shared centre turn lane). In addition, the new roadway will include intersection improvements, traffic signal upgrades, paved shoulders with rumble strips, drainage improvements, new signage, pavement markings and guide rails, where required. Approximately 975 metres of water main upgrades will also be undertaken near the Chelmsford section of this corridor.
Project Background
MR35 is an important gateway to the community of Greater Sudbury. MR35 is an arterial road that connects the communities of Azilda, Chelmsford, Dowling, Levack, and Onaping to the downtown. The widening of MR35 to install additional driving lanes was recommended in the Sudbury Regional Transportation Study (March 1992), and reaffirmed in the 2005 Transportation Master Plan Study and the 2015 Transportation Master Plan Study for the City of Greater Sudbury.
Project Construction
Construction of MR35 began in the fall of 2018 with a culvert replacement contract.
In 2019, MR35 was widened from two (2) to four (4) lanes from Notre Dame Street East (Azilda) to Notre Dame Street West (Azilda). Intersection and drainage improvements were also completed along this section of MR35. Final layer of asphalt and restoration work to be completed in the Spring of 2020.
In 2020, construction is planned for the widening and infrastructure improvements along MR35 from Notre Dame Street West (Azilda) to Highway 144 (Chelmsford).
2018 Culvert Replacement Contract
MR35 Contract 1 - Notre Dame Street East (Azilda) to Notre Dame Street West (Azilda)
MR35 Information Boards - Sept 27, 2018
MR35 Contract 2 - Highway 144 (Chelmsford) to Notre Dame Street West (Azilda)
Road and watermain improvements on Municipal Road 35 (MR35), between Highway 144 (Chelmsford) and 300 m east of Notre Dame West (Azilda) will be carried out between Summer 2020 and Fall 2021. Work will take place Monday to Friday, 7:00 AM to 7:00 PM.
Final asphalt will be completed in the Fall of 2021. Please note these timelines are subject to change.
Mumford Road
Mumford Road (Sudbury)
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Mumford Road, Sudbury, between Vagnini Court and Duhamel Road.
Construction by the City’s contractor, Teranorth Construction and Engineering Ltd., will be carried out between May 11, 2020 and September 2020. Work will take place Monday to Friday, 7:00am to 6:00pm.
Final asphalt to be completed in the 2020 construction season.
Please note these timelines are subject to change.
Construction Details:
- Full Depth Removal of Existing Asphalt
- Supply and Placement of Hot Mix Asphalt
- Drainage Improvements including ditching
- Driveway Restoration
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager
Andrew Peltomaki
705-674-4455 ext. 4392
andrew.peltomaki@greatersudbury.ca
Nicolet Street
Nicolet Street, Sudbury
Watermain Lining
The City of Greater Sudbury will be completing Watermain Lining on Nicolet Street, Sudbury, between Secord Court and Nicolet Street (Cul-de-sac).
Construction by the City’s contractor, Fer-Pal Construction Limited, will be
carried out between May 2020 and October 2020.
Construction Details:
- Install temporary above-ground water supply system
- Watermain lining
- Restoration to affected areas
During construction, there may be dust and noise in the area. The City makes every effort
to reduce the impact to nearby residents and business owners. Thank you for your
patience as we work to improve the roads and infrastructure in your neighbourhood. The
City of Greater Sudbury and its contractors are committed to public safety and will monitor
the ongoing progress of construction.
Project Manager:
Marc Khoury
705-674-4455, extension 2935
marc.khoury@greatersudbury.ca
Notre Dame Avenue (Valley East)
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Notre Dame Avenue (Valley East) between Dominion Drive and 760 m North of Dominion Drive.
Construction by the City’s contractor, Interpaving Ltd., will be carried out between June 2020 and September 2020.
Construction Details:
- In-Place Recycling of Existing Asphalt
- Placement of New Asphalt
- Drainage Improvements including some ditching and road culvert replacements
Your street is part of the City of Greater Sudbury’s Council approved asphalt resurfacing program. Work will be completed in the 2020 construction season. The expected start date will be communicated in a follow-up notice closer to construction.
Project Manager:
Miranda Edwards
705-674-4455 ext. 4246
miranda.edwards@greatersudbury.ca
Old Hwy 17 (MR55)
Asphalt Rehabilitation
Old Hwy 17 (MR55) from 195 East of Koti Road to Horizon Drive.
The City of Greater Sudbury will be completing road improvements on Old Hwy 17 (MR55) from 195 East of Koti Road to Horizon Drive.
Construction by the City’s contractor, Garson Pipe Contractors Ltd.,will be carried out from May 2020 to July 2020.
Construction Details:
- In-place recycling of existing asphalt
- Placement of new asphalt
- Replacement of road culverts
The City makes every effort to reduce the impact to nearby residents and business owners. Plans are in place to manage traffic in the area to ensure the safety of workers and the travelling public. You may experience some delays .At times, the roadway may be reduced to one lane of traffic to accommodate construction.
Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Old Hwy 69 (MR80)
Asphalt Rehabilitation
Old Hwy 69 (MR80) from Maley Dr Exit Ramp to Donaldson Dr.
The City of Greater Sudbury will be completing road improvements on Old Hwy 69 (MR80) from Maley Dr Exit Ramp to Donaldson Dr.
Construction by the City’s contractor, Garson Pipe Contractors Ltd.,
will be carried out from July 2020 to September 2020.
Construction Details:
- Replacement of road crossing culverts
This is a Designated Construction Zone. The speed limit within this area will be reduced from 80km/hr to 60km/hr through construction.
The City makes every effort to reduce the impact to nearby residents and business owners. Plans are in place to manage traffic in the area to ensure the safety of workers and the travelling public. You may experience some delays .At times, the roadway may be reduced to one lane of traffic to accommodate construction.
Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager:
Miranda Edwards
705-674-4455 ext. 4246
miranda.edwards@greatersudbury.ca
Palladium Place
Palladium Place (Sudbury)
Surface Asphalt Placement
The City of Greater Sudbury will be completing surface asphalt placement on Palladium Place, Sudbury, from Topaz Court to Corsi Hill.
Construction Details:
- Supply and Placement of Hot Mix Asphalt
Expected Start Date: Spring/Summer 2020
Expected End Date: Fall/Winter 2020
Project Manager
Andrew Peltomaki
705-674-4455 ext. 4392
andrew.peltomaki@greatersudbury.ca
Paris Notre Dame Bikeway
The City of Greater Sudbury will be completing active transportation improvements on Notre Dame Avenue between Wilma Street and Lasalle Boulevard. Construction by the City’s Contractor, Interpaving Ltd., will be carried out between June and October 2020.
Work will take place Monday to Friday, 7:00 am to 7:00 pm. Please note these timelines are subject to change.
Construction Details:
• New cycle facility on east and west sides of
Notre Dame Avenue
• New sections of curb and sidewalk
• Landscaping
• Street lighting and intersection improvements
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Ramsey Lake Road
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Ramsey Lake Road (MR39) between Paris Street (MR80) and South Bay Road.
Construction by the City’s Contractor, Teranorth Construction & Engineering Limited will be completed in the following phases:
Phase 1 – Will be carried out from October 2020 to November 2020.
Phase 2 – Will be carried out from June 2021 to September 2021.
Construction Details:
Phase 1:
• Replacement of road culverts
Phase 2:
• Placement of new asphalt
• Spot repair of concrete curb and sidewalk
• Installation of signalized pedestrian crosswalk at Science North
• Replacement of Road Culvert at University Road
• Installation of Steel Beam Guide Rail
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Questions about construction can be directed to:
Project Manager:
Miranda Edwards
705-674-4455, extension 4246
miranda.edwards@greatersudbury.ca
Richelieu Court
Richelieu Court & Landreville Drive (Sudbury)
Surface Asphalt Placement
The City of Greater Sudbury will be completing surface asphalt placement on Richelieu Court (Sudbury) from Maley Drive to the cul-de-sac as well as Landreville Drive from Richelieu Court to the cul-de-sac (see map).
Construction Details:
- Supply and Placement of Hot Mix Asphalt
Expected Start Date: Spring/Summer 2020
Expected End Date: Fall/Winter 2020
Project Manager
Andrew Peltomaki
705-674-4455 ext. 4392
andrew.peltomaki@greatersudbury.ca
Rideau Street
Rideau Street, Sudbury
Watermain Lining
The City of Greater Sudbury will be completing Watermain Lining on Rideau Street, Sudbury, between Lasalle Boulevard and Lavoie Street.
Construction by the City’s contractor, Fer-Pal Construction Limited, will be carried out between May 2020 and October 2020.
Construction Details:
- Install temporary above-ground water supply system
- Watermain lining
- Restoration to affected areas
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager:
Marc Khoury
705-674-4455, extension 2935
marc.khoury@greatersudbury.ca
Rita Street
Rita Street, (Sudbury)
Watermain Replacement
The City of Greater Sudbury will be completing road road and water/wastewater improvements on Rita Street (Sudbury) between Wilfred Street to the End.
Construction by the City’s contractor, Teranorth Construction, will be carried out between May 2020 and October 2021. Work will take place Monday to Friday, 7 am and 7 pm.
Final asphalt will be completed in the fall of 2021.
Please note these timelines are subject to change.
Construction Details:
- Replace watermain including water services to property line
- Replace sanitary sewer services to property line
- Full Depth Removal of Existing Asphalt
- Supply and Placement of Hot Mix Asphalt
- Drainage Improvements including ditching
- Construction of new cul-de-sac
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction
Project Manager
Andrew Peltomaki
705-674-4455 ext. 4392
andrew.peltomaki@greatersudbury.ca
Scarlett Road
Scarlett Road, Sudbury
Watermain Lining
The City of Greater Sudbury will be completing Watermain Lining on Scarlett Road, Sudbury, between Second Avenue and Greenbriar Drive.
Construction by the City’s contractor, Fer-Pal Construction Limited, will be carried out between May 2020 and October 2020.
Construction Details:
- Install temporary above-ground water supply system
- Watermain lining
- Restoration to affected areas
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager:
Marc Khoury
705-674-4455, extension 2935
marc.khoury@greatersudbury.ca
Scenic Drive
Scenic Drive (Valley East) Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Scenic Drive (Valley East) between Valleyview Road and South End of Scenic Drive.
Construction by the City’s contractor, Interpaving Ltd., will be carried out between May 2020 and September 2020.
Construction Details:
- In-Place Recycling of Existing Asphalt
- Placement of New Asphalt
- Drainage Improvements including some ditching and road culvert replacements
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager:
Miranda Edwards
705-674-4455 ext. 4246
miranda.edwards@greatersudbury.ca
Skead Road
Asphalt Rehabilitation
Skead Road (MR86) from Radar Road (MR85) to Airport Terminal Road.
The City of Greater Sudbury will be completing road improvements on Skead Road (MR86) from Radar Road (MR85) to Airport Terminal Road.
Construction by the City’s contractor, Garson Pipe Contractors Ltd., will be carried out from early May 2020 to July 2020.
Construction Details:
- In-place recycling of existing asphalt
- Placement of new asphalt
- Replacement of road culverts
The City makes every effort to reduce the impact to nearby residents and business owners. Plans are in place to manage traffic in the area to ensure the safety of workers and the travelling public. You may experience some delays .At times, the roadway may be reduced to one lane of traffic to accommodate construction.
Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Spanish River Road Bridge
The City of Greater Sudbury will be completing road and bridge improvements on Spanish River Road, Beaver Lake area, 3.1km West of Manninen Road.
- Bailey Bridge Replacement
- Asphalt Paving
- Guiderail Installation
- Full Road Closure at Bridge Location (Detour via Manninen Road and Hwy. 17)
Expected Start Date: Mid June 2020
Expected End Date: Early October 2020
The construction phase of the Project is anticipated to be carried out between June 15, 2020 and October 2, 2020.
Related Documents
Pre-Construction Notice
Public Information Session
Resident Notice
Plan
Section
Detour Plan
*Timeline is subject to change due to COVID-19 Restrictions*
Project Manager:
Chris Cornell
705-674-4455, extension 4239
chris.cornell@greatersudbury.ca
Sunnyside Road
Sunnyside Road (Sudbury)
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Sunnyside Road, Sudbury, between Long Lake Road and Luoma Road.
Construction by the City’s contractor, Teranorth Construction and Engineering Ltd., will be carried out between April 2020 and September 2020. Work will take place Monday to Friday, 7:00am to 6:00pm.
Final asphalt to be completed in the 2020 construction season.
Please note these timelines are subject to change.
Construction Details:
- Full Depth Removal of Existing Asphalt
- Supply and Placement of Hot Mix Asphalt
- Drainage Improvements including ditching
- Driveway Restoration
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager
Andrew Peltomaki
705-674-4455 ext. 4392
andrew.peltomaki@greatersudbury.ca
Surface Treatment - Various Locations
Surface Treatment, Various Locations
The City of Greater Sudbury will be completing road improvements in several areas
Construction by the City’s contractor, Denis Gratton Construction Ltd., will be carried out between June and November, Monday to Friday, 7:00 a.m. to 7:00 p.m.
Please note these timelines are subject to change.
Construction Details:
- In-place full depth reclamation of the road surface (pulverizing)
- Placement of Granular ‘A’
- Maintenance of each road until surface treated
- Emulsified asphalt surface treatment
- Culvert replacements / ditching, as required
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Questions about construction can be directed
Project Manager:
Rebecca Gilchrist
705-674-4455 ext. 4218
rebecca.gilchrist@greatersudbury.ca
Location maps
1. Goodwill Drive (Garson)
2. Goodwill Drive (Garson)
3. O’Neil Drive West (Garson)
4. O’Neil Drive West (Garson)
5. West Bay Road (Skead)
6. Spanish River Road (Worthington)
7. Spanish River Road (Worthington)
8. Spanish River Road (Worthington)
9. North Shore Black Lake (Lively)
10. Fairbank Lake Road – MR4 (Worthington)
11. Fairbank East Road (Whitefish)
12. Moxam Landing Road (Lively)
13. Grassy Lake Road (Skead)
14. Den Lou Road (Whitefish)
15. McKenzie Road (Chelmsford)
16. Bruno Street (Azilda)
17. Montee Rouleau (Chelmsford)
18. Vermilion Lake Road (Chelmsford)
19. Theriault Road (Hanmer)
20. Martin Road (Val Caron)
21. Bodson Drive West (Val Caron)
22. Frenchman Lake Road (Hanmer)
23. Tilton Lake Road (Sudbury)
24. South Lane (Sudbury)
25. Pine Hill Road (Sudbury)
26. Goodwill Drive (Garson)
27. Goodwill Drive (Garson)
28. West Bay Road (Skead)
29. West Bay Road (Skead)
30. West Bay Road (Skead)
31. Hill Street (Wahnapitae)
32. MR4 (Whitefish)
33. Morgan Road (Chelmsford)
34. Morgan Road (Chelmsford)
35. Montpellier Road (Chelmsford)
36. Edgewater Road (Sudbury)
37. Bodson Drive West (Val Caron)
Tenth Avenue
Tenth Avenue (Lively)
Watermain Improvements
The City of Greater Sudbury will be completing watermain improvements on Tenth Avenue, Lively, between ‘B’ Street and ‘C’ Street.
Construction by the City’s Contractor, Teranorth Construction & Engineering Limited, will be carried out in the 2020 Construction season, starting in May.
Work will take place Monday to Friday, 7am to 6pm.
Complete road and sidewalk restoration will occur in the future.
Please note these timelines are subject to change.
Construction Details:
- Excavate and install a new Watermain along Tenth Avenue.
- Installation of new water services to houses along the east side of Tenth Avenue.
- Abandon in place, the existing rear yard watermain and services.
- Complete interior plumbing works to connect the water service to the existing pumping where required. Those homeowners affected will be contacted separately.
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Questions about construction can be directed to:
Project Manager:
Rebecca Gilchrist
705-674-4455 ext 4218
rebecca.gilchrist@greatersudbury.ca
Valleyview Road
Asphalt Rehabilitation
The City of Greater Sudbury will be completing road improvements on Valleyview Road (Valley East) between St. Laurent Street and Martin Road.
Construction by the City's contractor, Interpaving Ltd., will be carried out between June 2020 and September 2020.
Construction Details:
- In-Place Recycling of Existing Asphalt
- Placement of New Asphalt
- Drainage Improvements including some ditching and road culvert replacements
Your street is part of the City of Greater Sudbury’s Council approved asphalt resurfacing program. Work will be completed in the 2020 construction season. The expected start date will be communicated in a follow-up notice closer to construction.
Project Manager:
Miranda Edwards
705-674-4455 ext. 4246
miranda.edwards@greatersudbury.ca
Wastewater Improvements - Various Locations
The City of Greater Sudbury will be completing wastewater improvements throughout the City of Greater Sudbury
Construction by the City’s contractor, Insituform, will be carried out between Summer 2020 and Fall 2020.
Work will take place Monday to Friday, 7:00am to 7:00pm.
Please note these timelines are subject to change.
Construction Details:
- Structural Lining using Cured-in-Place Pipe (CIPP) of existing sanitary sewer
Project Manager:
Marc Khoury
705-674-4455, extension 2935
marc.khoury@greatersudbury.ca
Locations include:
1.Front Street, Capreol, between Young Street and Bloor Street
2.Godfrey Drive, Copper Cliff, between Serpentine Street and Park Street
3.Hanna Avenue, Capreol, between Dennie Street and Kelly Street
4.Harvey Street, Sudbury, between Leslie Street and Mountain Street
5.Helene Street, Val Caron, between Leo Avenue and Marie Avenue
6.Highland Crescent, Capreol, North of Oakwood Avenue
7.Jupiter Court, Sudbury, south of Telstar Avenue
8.Lincoln Crescent, Capreol, between Dennie Street and Hillcrest Avenue
9.Lincoln Street, Capreol, between Norman Avenue and Sellwood Avenue
10.Mabel Avenue, Sudbury, between Kathleen Street and Suffolk Lane
11.Martindale Road, Sudbury, between Boyce Street and Marcel Street
12.McKim Street, Sudbury, between Erie Street and Beatty Street
13.Neelon Avenue, Sudbury, between Weller Street and the dead end
14.Nickel Street, Copper Cliff, between Balsam Street and Peter Street
15.Norman Crescent, Val Caron, between Velma Street and Harold Crescent
16.Notre Dame Avenue, Hanmer, between St Isadore Street and Oscar Street
17.Odile Street, Hanmer, between Carina Drive and Chenier Street
18.Peter Street, Copper Cliff, between Church Street and Balsam Street
19.Railway Avenue, Capreol, between Mooney Street and Dennie Street
20.Rose Court, Val Caron, north of Dominion Drive
21.St Raphael Street, Sudbury, between Lourdes Street and the dead end
22.Swanson Court, Val Caron, between Velma Street and Harry Street
23.Tenth Avenue, Lively, between C Street and Ninth Avenue
24.Third Avenue, Coniston, between Cedar Street and Government Road
25.Third Avenue, Levack, between Cartier Street and 40 m south
26.Walnut Street, Sudbury, between Regent Street and Lorne Street
27.Whittaker Street, Sudbury, between Albert Street and Elm Street
28.Albinson Street, Sudbury, between Arnley Street and Douglas Street
29.Alder Street, Sudbury, between Walnut Street and Oak Street
30.Anthony Street, Sudbury, between Regent Street and the end of Anthony Street
31.Arnley Street, Sudbury, between Horobin Street and the dead end of Arnley Street
32.Austin Street, Sudbury, between Regent Street and the end of Austin Street
33.Birch Lane, Garson, between Spruce Street and Birch Street
34.Birch Street, Garson, between Beech Street and Church Street
35.Birch Street, Sudbury, between Lorne Street and Oak Street
36.Bloor Street, Sudbury, between Frood Road and College Street
37.Carol Street, Val Caron, between Claire Street and Mark Street
38.Christakos Street, Sudbury, between Howey Drive and the end of Christakos Street
39.Collins Drive, Copper Cliff, between Power Street and Orford Street
40.Dennie Street, Capreol, between Pine Street and Hillcrest Avenue
41.Edna Street, Sudbury, between Haig Street and Buchanan Street
42.Elm/Spruce Street Easement, Sudbury, between Elm Street and Spruce Street
43.Ferguson Avenue, Capreol, between Dennie Street and Chapman Street
44.Fifth Street, Val Caron, between MR80 and Northwood Drive
Westmount Avenue
Westmount Avenue, Sudbury
Watermain Lining
The City of Greater Sudbury will be completing Watermain Lining on Westmount Avenue, Sudbury, between Attlee Avenue and Barrydowne Road.
Construction by the City’s contractor, Fer-Pal Construction Limited, will be carried out between May 2020 and October 2020.
Construction Details:
- Install temporary above-ground water supply system
- Watermain lining
- Restoration to affected areas
During construction, there may be dust and noise in the area. The City makes every effort to reduce the impact to nearby residents and business owners. Thank you for your patience as we work to improve the roads and infrastructure in your neighbourhood. The City of Greater Sudbury and its contractors are committed to public safety and will monitor the ongoing progress of construction.
Project Manager:
Marc Khoury
705-674-4455, extension 2935
marc.khoury@greatersudbury.ca